Sometimes my interpretation of the CDM regulations seemed to be different to that held by EPCM contractors. Here are 6 examples.
Design
Read insights about Design
Fire Protection Design Is Not Straight Forward
Designers must consider two essential types of fire protection to ensure safety & compliance in their projects.
LEAN Principles and Capital Projects
LEAN principles offer a framework for optimising the management of projects, enhancing efficiency & reducing waste. But is it a good fit for Capital Projects?
Piping Design Always Takes Longer Than Planned
Piping design is a specialised & diminishing field. Should we be concerned about its potential negative effects on process projects?
Subcontractors Should Receive More Recognition
Why is establishing a strong rapport with subcontractors so crucial during the implementation of capital projects?
Client’s Perspective of Capital Projects
Which holds greater importance for Clients: the focus on design or the emphasis on construction progress & site safety?
Project Phases Should Be Minimised If Possible
To optimize efficiency & resource allocation, it is essential to reduce project phases following sanction whenever feasible.
Process Engineers Have A Huge Responsibility
The value of collaborating with esteemed & exceptionally proficient Process Engineers.
Design Standards Provided By Clients
Engaging in open dialogue & thorough analysis of client specifications paves the way for innovative solutions that set the stage for successful project execution.
Car Park Design Should Not Be Left To Architects
Engineers should always be asked to review car park design as practical and safety aspects are often missed by Architects.
Four Design Reviews Which Benefit Capital Projects
Design reviews are essential as they foster collaboration & enhance creativity. Discover 4 more benefits.
HVAC Solutions Could Have Been Better
HVAC design does not seem to be an exact science. Designers frequently get it wrong. What do we need to be aware of?
Modular Builds Are Hopefully The Future
Modular builds offer flexible solutions , raising the question of whether they represent the future of project management for construction.
Vendor Data Should Be Given Higher Priority
Equipment vendors provide the equipment itself & the relevant vendor information. Many requisitions overlook the importance of vendor data